TY - JOUR AU - Ferrante, Tiziana PY - 2019/11/29 Y2 - 2024/03/29 TI - The detailed design project: role, objetives, potential JF - TECHNE - Journal of Technology for Architecture and Environment JA - Techne VL - IS - 18 SE - Dossier DO - 10.13128/techne-7504 UR - https://oaj.fupress.net/index.php/techne/article/view/7504 SP - 18-26 AB - <div>If due to cultural options and/or editorial requirements this number of&nbsp;Techne is cantered exclusively on the</div><div>“design phase” (in particular the one&nbsp;referred to construction), it doesn’t&nbsp;mean at all that - within the building</div><div>process such phase cannot (or better should not) be coordinated with the “scheduling”, “realization” and “operational” phases which, as required&nbsp;by the Architectural Technology discipline, should be coherently bound to</div><div>each other.</div> ER -