[1]
Germanà, M.L. 2020. The suspended time of the interrupted process: beyond repression, a future for unfinished buildings. TECHNE - Journal of Technology for Architecture and Environment. 20 (Jul. 2020), 89–97. DOI:https://doi.org/10.13128/techne-8142.