Research and Experimentation
Published 2013-10-24
Keywords
- Risk management,
- Maintenance,
- Uncertainty,
- Architectural design
How to Cite
Martani, C., Talamo, C., & Paganin, G. (2013). The control, at the design stage, of risks related to buildings management over time. TECHNE - Journal of Technology for Architecture and Environment, (6), 109–116. https://doi.org/10.13128/Techne-13463
Abstract
In the present paper an apparatus of tools and methods is presented to evaluate, at the design stage, the risks over a set of objectives through buildings lifetime. To this purpose a tool is first presented to relate technological requirements of each technical elements to the pertinent maintenance interventions. Then a process is also proposed to estimate the risks on user requirements runningMonte Carlo simulations. The risk management process proposed in the present work aims to support designers and promoters in making predictions on the outcomes of long, not standardized, multivariable dependent processes – as the building process is – in order to indicate the attitude of a designed building to meet a framework of important objectives through its lifetime.Downloads
Download data is not yet available.